How it works
A Level 2 home charger needs a breaker rated at 125% of its current, rounded up to the next standard size, so a 40 amp charger goes on a 50 amp breaker. From the charger’s current and the length of the run, the calculator also picks the smallest copper wire in the ampacity table and gives the voltage drop and the time to charge.
The electrician’s bill for a new circuit is a one-off cost. To see what room a paycheck leaves for it, use the US take-home pay calculator, and if you are paying for the installation with a loan, see what the repayments come to. If the charger is part of a new garage or workshop, the US timber span calculator gives joist and rafter spans for the framing.
The formula
breaker = 125% × charger current, rounded up to the next standard size
wire = smallest copper size whose ampacity ≥ 125% × current (or the current)
voltage drop = 2 × 12.9 × current × one-way length ÷ circular mils of the wire
charge time = battery kWh × (target − start) ÷ (charging kW × efficiency)
charging kW = the smaller of the charger (volts × amps ÷ 1000) and the car's limit
The ampacities are from Table 310.16 for copper conductors in the 60 and 75 degree columns.
What each input means
- Charger current and Supply voltage. From the charger’s label or setting.
- Wire run. One way, from the panel to the charger.
- Terminal temperature rating. 60 degrees C unless the equipment is marked for 75.
- Size the wire for 125%. Ticked is the conservative choice.
- Battery, charge levels, car limit and efficiency. Used for the charging time only. They do not change the breaker or the wire.
A worked example
A 40 amp charger on 240 volts, 50 feet from the panel, with wire sized at 125%.
- Breaker: 125% × 40 = 50 amps, which is a standard size, so 50
- Wire: 125% × 40 = 50 amps needed. In the 60 degree column 8 AWG is 40 amps and 6 AWG is 55 amps, so 6 AWG copper
- Voltage drop: 2 × 12.9 × 40 × 50 ÷ 26,240 = 1.97 volts, which is 0.82% of 240 volts
- Charging power: 240 × 40 ÷ 1000 = 9.6 kW, below the car’s 11.5 kW limit
- Charge time from 20% to 80% of a 75 kWh battery: 45 kWh ÷ (9.6 × 0.90) = 5.21 hours
How the figures are rounded
Currents are used as entered. Voltage drop and charging time are rounded to two decimal places.
What it leaves out
Aluminum wire, wire in conduit with more than three conductors or high ambient temperatures, the panel’s spare capacity, adjustable-current chargers set below their rating, load management systems, ground-fault protection requirements, permits and the local edition of the code. The resistivity constant and circular mil values are standard published figures. This page has not been compared with the code text itself, so a licensed electrician must confirm every figure.
Common questions
Why is the breaker 125% of the charger current?
An EV charger is treated as a continuous load, which means it runs for three hours or more. The code sizes the breaker at no less than 125% of the charger's maximum current, then rounds up to the next standard size. A 40 amp charger needs a 50 amp breaker.
Does the wire have to be sized for 125% too?
Practice varies. The general rule for branch circuits applies 125% to the wire as well, and many inspectors require it. A New Jersey code opinion accepts wire sized to the charger current with only the breaker at 125%. The box above is ticked by default, which is the safer choice. Ask your local inspector.
What does the terminal rating mean?
It is the temperature the breaker and charger terminals are rated for, normally 60 degrees C for circuits of 100 amps or less unless the equipment is marked for 75. The wire is chosen from the matching column of the ampacity table.
Do I need to worry about voltage drop?
On long runs, yes. The code suggests keeping the drop on a branch circuit to about 3%. A larger wire reduces it. The calculator flags a drop over 3% and does not choose a bigger wire for you.
Is this enough to install a charger?
No. The panel must have spare capacity, which a service load calculation shows, and an electrician has to install the circuit and in most places pull a permit. Treat this as a planning check before you call one.
Sources and review
The method and any rates on this page come from:
- Code Assistance Unit: electric vehicle supply equipment, NEC 625.41 and 625.42, New Jersey Department of Community Affairs
- Electrical: EVSE load and NEC 625.42, Washington State Department of Labor and Industries
- NFPA 70 National Electrical Code, free access reader, National Fire Protection Association